As smoke and fire become bigger issues, the next generation of designs from De Silva Solutions will look to install XPS above the floor, sandwiched under a screed. DOW now recommends 60mm screed, up from 50mm. It’s recommended that a structural engineer be consulted as most XPS fall between 250-400kPa (700kPa is a special order).